How do I hide project base arrows in Revit?

How do I hide project base arrows in Revit?

Click Edit Inputs command. Pick True to hide points.

How do I change the base point of a project in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it.
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar.
  3. Drag the project base point to the desired location.

What is project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.

How do you find a project base point in Revit?

Click View tab Graphics panel (Visibility/Graphics). On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point.

What is the phase filter setting for a typical demolition plan in Revit?

Click on the element you want to demolish and it will be set to “demolished” in the current phase. You can also simply select an element and set the “New” phase in Phase Demolished properties.

How do you use project base point?

To move the project base point: Drag the project base point to the desired location. As an alternative, using the Properties palette or the Project Base Point fields in the drawing area, enter values for N/S (northing), E/W (easting), Elevation, and Angle to True North.

How do you move project base point more than 10 miles?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.

How do you manage phasing in Revit?

Create a Phase

  1. Click Manage tab Phasing panel (Phases). The Phasing dialog opens, displaying the Project Phases tab.
  2. Click the number box adjacent to a phase. Revit selects the entire phase row.
  3. Insert a phase.
  4. If desired, click the Name text box of a phase to rename it.
  5. Click OK.

How do you change the current phase in Revit?

Click Manage tab Phasing panel (Phases). In the Phasing dialog, click the Phase Filters tab. Click New to insert a new phase filter. The filter is assigned a default name.

How do I hide project base arrows in Revit? Click Edit Inputs command. Pick True to hide points. How do I change the base point of a project in Revit? Define the Project Base Point Open the site plan view or another view that displays it. To select the project base point, move the cursor…